Engineering and Supervisory Services for Urgent Development Plan of Semarang Port Project Phase II - Stage I (Contract Package No. 1 : Civil and Building Works)

This project is intended to construct a full fledged container terminal in Semarang Port to cope with the growing demand for efficient handling of the rapidly increasing container cargo.  The project components include :

1)         Container wharf (-10 m deep, 345 m long);

2)         Retaining wall (407 m long);

3)         Revetment (2,510 m long in total);

4)         Container yard (7 ha) with CFS (3,600 m2), maintenance shop (1,600 m2), workshop (1,350 m2) and office buildings and utilities;

Assignment Name:

Engineering and Supervisory Services for Urgent Development Plan of Semarang Port Project Phase II - Stage I (Contract Package No. 1 : Civil and Building Works)

Country:

Indonesia

Location within Country:

Semarang

Professional Staff Provided by Your Firm:

Project Manager, Advisor, Port Planner, Port Eng., etc.

Name of Employer:

Ministry of Transportation, Government of Indonesia

No. of Staff:

13

Address:

J1. Medan Merdeka Barat No. 8, Jakarta Pusat, Indonesia

No. of Staff-Months:

266.7 M/M

Start Date (Month/Year):

April 21, 1992

Completion Date (Month/Year):

February 28, 2000

Approx. Value of Services (in Current US$):

USD 7,299,021

Duration of the Services:

  94.7 Months

Name of Associated Consultants, if any:

  Associated Firm : PT. Wiratman & Associates

No. of Months of Professional Staff Provided by Associated Consultants:

393.9 M/M

Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:

M. Imamura : Project Manager     A. Gokan : Project Advisor

Approximate Total Value of the Project:

USD 88.6 Million

Narrative Description of Project:

This project is intended to construct a full fledged container terminal in Semarang Port to cope with the growing demand for efficient handling of the rapidly increasing container cargo.  The project components include :

1)         Container wharf (-10 m deep, 345 m long);

2)         Retaining wall (407 m long);

3)         Revetment (2,510 m long in total);

4)         Container yard (7 ha) with CFS (3,600 m2), maintenance shop (1,600 m2), workshop (1,350 m2) and office buildings and utilities;

5)         Navigation channel and basin dredging (2,096,000 m3);

6)         Reclamation (650,000 m3);

7)         Foundation improvement (106,000 m2); and

8)         Access road (1 km long).

Description of Actual Services Provided by Your Staff:

The consulting services provided by our staff cover the following :

1)       Study on existing wharf productivity and port capacity in 1995, optimum site for additional container wharf, and on environmental protection and management strategy for the port;

2)       Review of existing designs of project facilities, and detailed designs of project facilities;

3)       Review and revision of original prequalification and bidding documents and cost estimates;

4)       Assistance in bidding; prequalification announcement and evaluation, tender announcement and evaluation, and contract negotiation and award;

5)       Supervision of construction works;

6)       Final inspection of container terminal facilities before expiry of Defects Liability Period;

7)       Technology transfer; and

8)       Final inspection of project facilities before expiry of maintenance period.