Narrative Description of Project:
The project consists of following :
1) Renovated existing North Pier (2-berth, each –11 m deep) to handle containers;
2) New North Berth (-7.5 m deep) to handle general cargo and cement in bulk;
3) Revetment (280 m long in total):
4) Dredging of navigation channel and port basin (39,500 m3);
5) Reclamation (250,000 m3);
6) Widened pier apron for container yard and open yard for general cargo;
7) Construction of container yard and open yard (7.8 ha);
8) Gate and office building (1,041 m2) as a control center of New North Pier area, and utilities;
9) Port access road (12,000 m2), and
10) Panamax quayside container cranes (3 units), transfer crane (6 units) and other container handling equipment.
|