• Language:
Consulting Services for Da Nang Port Improvement Project (Contract Package Nos. 1 to 5)

A comprehensive study was conducted by JBIC to supplement and consolidate various previous relevant studies by ADB and JICA for overall development of Da Nang Port. The study identified the necessity for phased expansion of Tien Sa Port to cope with anticipated increase in future cargo throughput in Da Nang Port.

Project components include breakwater of 450 m long (including foundation improvement works), repairs and remodeling of existing conventional piers 1 & 2 (each 186 m long x –11 m deep) to container piers, CFS of 2,000 m3 and other buildings, utilities, container terminal of 34,500 m2, port basin dredging of 357,000 m3, upgrading of existing port access road of 12.3 km, bridge of 530 m long with approach of 1,540 m long linking the access road, Da Nang Bypass of 18 km

Assignment Name:

Consulting Services for Da Nang Port Improvement Project (Contract Package Nos. 1 to 5)

Country:

Vietnam

Location within Country:

Da Nang Port

Professional Staff Provided by Your Firm:

Project Manager, Port Eng., Civil Eng., Mech. Eng., Architect, etc.

Name of Employer:

Project Management Unit No. 85, Ministry of Transport, Gov. of Vietnam

No. of Staff:

  12

Address:

184 Nguyen Sy Sach Street, Vinh City, Vietnam

No. of Staff-Months:

208.0 M/M

Start Date (Month/Year):

March 15, 2000

Completion Date (Month/Year):

March 31, 2008

Approx. Value of Services (in Current US$):

US$ 8,032,505

Duration of the Services:

  81.5 Months

Name of Associated Consultants, if any:

Associated Firm (1) : Maunsell Group – Australian (MAUNSELL)

Associated Firm (2) : Transport Engineering Design Incorporated (TEDI)

No. of Months of Professional Staff Provided by Associated Consultants:

568.6 MM

Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:

K. Nagai : Project Manager (Pre-Construction Stage)

H. Kubota : Project Manager (Construction Stage)

Approximate Total Value of the Project:

USD 136 Million

Narrative Description of Project:

A comprehensive study was conducted by JBIC to supplement and consolidate various previous relevant studies by ADB and JICA for overall development of Da Nang Port. The study identified the necessity for phased expansion of Tien Sa Port to cope with anticipated increase in future cargo throughput in Da Nang Port.

Project components include breakwater of 450 m long (including foundation improvement works), repairs and remodeling of existing conventional piers 1 & 2 (each 186 m long x –11 m deep) to container piers, CFS of 2,000 m3 and other buildings, utilities, container terminal of 34,500 m2, port basin dredging of 357,000 m3, upgrading of existing port access road of 12.3 km, bridge of 530 m long with approach of 1,540 m long linking the access road, Da Nang Bypass of 18 km, infrastructure for resettlement area, road junction upgrading, panamax quayside container crane (1 unit), transfer cranes (2 units)and other container handling equipment, tugboat, and container yard operation computer system.

Description of Actual Services Provided by Your Staff:

Consulting services provided by our staff cover the following :

1)       Natural conditions surveys;

2)       Existing facility surveys;

3)       EIA and environmental monitoring;

4)       Wave and wind observations and forecasting;

5)       Ship navigation simulation and navigation aids;

6)       Detailed design of project structures, facilities and equipment;

7)       Preparation of prequalification and bidding documents and cost estimates;

8)       Assistance in prequalification, bidding and contract procedures;

9)       Supervision of construction works and equipment procurement; and

10)    Technology transfer.


[ Back]