Master Plan and Feasibility Study for Sao Mai – Ben Dinh Petroleum Marine Logistics Base Project
The Owner. intends to build and operate a Petroleum Marine Logistics Base and a General Cargo Port at Sao Mai – Ben Dinh area to serve the oil and gas exploration companies off the Coast of Vietnam. The development includes site preparation of about 164 hectares land which will be formed in 2 levels: infrastructures, buildings and landscaping, shore protection, wharf and transit area; and all mechanical systems such as fire protection system, water distribution, sewage and sanitary, all electrical system, air-conditioning & ventilation, and telecommunication system for smooth operation of the base. 

Assignment Name:

Master Plan and Feasibility Study for Sao Mai – Ben Dinh Petroleum Marine Logistics Base Project

Country:

Vietnam

Location within Country:

Sao Mai – Ben Dinh Area, Ba Ria – Vung Tau Province

Professional Staff Provided by Your Firm:

Project Manager, Shipyard / Port Planner, Shipyard / Port Facility Design Expert and other Experts

Name of Employer:

Sao Mai – Ben Dinh Petroleum Investment Joint Stock Co.

No. of Staff:

10

Address:

Petrotower 3rd Floor, No. 8 Hoang Dieu, Ward 1, Vung Tau City, Vietnam 

No. of Staff-Months:

18.5 M/M

Start Date (Month/Year):

May 21, 2008

Completion Date (Month/Year):

August 20, 2008

Approx. Value of Services

(in Current US$):

Total : USD 674,080

JPC Share : USD 345,860

Duration of the Services:

  3 Months

Name of Associated Consultants, if any:

JV Leader : Meinhardt (Vietnam) Ltd.

JV Partner : Japan Port Consultants, Ltd.

No. of Months of Professional Staff Provided by Associated Consultants:

15.0 M/M

Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:

K. Nagai : Project Manager

Approximate Total Value of the Project:

USD 636 Million

Narrative Description of Project:

The Owner. intends to build and operate a Petroleum Marine Logistics Base and a General Cargo Port at Sao Mai – Ben Dinh area to serve the oil and gas exploration companies off the Coast of Vietnam. The development includes site preparation of about 164 hectares land which will be formed in 2 levels: infrastructures, buildings and landscaping, shore protection, wharf and transit area; and all mechanical systems such as fire protection system, water distribution, sewage and sanitary, all electrical system, air-conditioning & ventilation, and telecommunication system for smooth operation of the base.  The land will need to be allocated for the following infrastructures :

a) shipyard, b) exclusive user fabrication yard of about 40 ha which will enable very large oil rigs and platforms to be housed during repairs or fabrication, c) ship repair facility for supply and cargo vessels ranging from 8,000 DWT to 9,000 DWT in 5 – 6 m water including shiplift system of minimum 3,000 DWT capacity, and d) marine logistics section with shiplift system.

Description of Actual Services Provided by Your Staff:

The consulting services provided by our staff cover the following :

1) Formulation of port master plan, 2) Feasibility study – Site investigation and marine data collection, 3) Basic engineering design & general project cost estimation, 4) Specialized studies, 5) Marine environmental impact assessment, 6) Life cycle cost analysis, 7) Business operating model study, and 8) General consultation and advice.