• Language:
Consulting Services for Domestic Maritime Transport Project

Domestic Maritime Transport Project comprises (1) Infrastructure investment component, and (2) Institutional development and capacity building component.

The infrastructure investment component consists of enhancements to the existing Male North Harbor through (1) construction of general cargo / passenger wharf (- 4 m deep, 370 m long), projecting northward at right angles to Marine Drive alongside the boundary to Male Commercial Harbor, (2) dredging (13,000 m3), reclamation (26,000 m3), terminal yard (5,400 m2) with warehouse (4,800 m2) and other building and utility works, (3) provision of luffing crane (25-ton capacity, 1 unit) and forklift trucks, (4) construction of a temporary transit area for goods and passengers, and (5) IEE and other consulting services.


Assignment Name:

Consulting Services for Domestic Maritime Transport Project

Country:

Maldives

Location within Country:

Male

Professional Staff Provided by Your Firm:

Project Management Specialist, Team Leader, etc.

Name of Employer:

Ministry of Transport and Communication, Government of Maldives

No. of Staff:

8

Address:

Huravee Building Ameeru Ahmed Magu, Male 20114, Maldives

No. of Staff-Months:

60 M/M

Start Date (Month/Year):

November 15, 2007

Completion Date (Month/Year):

 August 15, 2009 (Estimated)

Approx. Value of Services

(in Current US$):

USD 576,300

Duration of the Services:

   21 Months

Name of Associated Consultants, if any:

  N/A

No. of Months of Professional Staff Provided by Associated Consultants:

N/A

Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:

T. Miyagawa : Project Management Specialist

T. Kawai, Team Leader

Approximate Total Value of the Project:

USD 10 Million

Narrative Description of Project:

Domestic Maritime Transport Project comprises (1) Infrastructure investment component, and (2) Institutional development and capacity building component.

The infrastructure investment component consists of enhancements to the existing Male North Harbor through (1) construction of general cargo / passenger wharf (- 4 m deep, 370 m long), projecting northward at right angles to Marine Drive alongside the boundary to Male Commercial Harbor, (2) dredging (13,000 m3), reclamation (26,000 m3), terminal yard (5,400 m2) with warehouse (4,800 m2) and other building and utility works, (3) provision of luffing crane (25-ton capacity, 1 unit) and forklift trucks, (4) construction of a temporary transit area for goods and passengers, and (5) IEE and other consulting services.

Description of Actual Services Provided by Your Staff:

Consulting services to be provided by our staff cover the following :

1)       Review of available surveys and studies;

2)       Natural conditions surveys and construction materials surveys;

3)       Port facilities layout plan and detailed designs;

4)       Bidding documents and cost estimates;

5)       IEE and update of EMP (Environmental Management Plan);

6)       Assistance in bidding and contract procedures;

7)       Construction supervision; and

8)       Project management.