Consulting Services for Feasibility Study of Seaport under Dong Lam Cement Plant Project

Dong Lam Cement Joint Stock Company plans to construct Dong Lam Cement Plant with clinker production capacity of 4,000 tons/day, at Phong Xuan and Phong An Communes, Phong Dien District, Thua Thien Hue Province, based on the Investment License granted by the Prime Minister under its letter No. 404/TTg-CN dated March 13, 2006.  In order to meet the demands for materials transportation of the plant, the project owner intends to construct a general cargo seaport and a dedicated road route connecting from the plant to the seaport


Assignment Name:

Consulting Services for Feasibility Study of Seaport under Dong Lam Cement Plant Project

Country:

Vietnam

Location within Country:

Dien Loc Commune, Phong Dien District,

Thua Thien Hue Province

Professional Staff Provided by Your Firm:

Team Leader, Port Planning Experts, Port Facility & Construction Plan Expert and Other Experts

Name of Employer:

Dong Lam Cement Joint Stock Company

No. of Staff:

5

Address:

Anpha Tower 8th Floor, 151 Nguyen Dinh Chieu, District 3, Ho Chi Minh City, Vietnam               

No. of Staff-Months:

25.3 M/M

Start Date (Month/Year):

February 6, 2009

Completion Date (Month/Year):

August 5, 2009 (Expected)

Approx. Value of Services

(in Current US$):

USD 404,000

Duration of the Services:

   6 Months

Name of Associated Consultants, if any:

  1. Transport Engineering Design Incorporation, Vietnam
  2. Consultancy Company of University of Civil Engineering, Vietnam

No. of Months of Professional Staff Provided by Associated Consultants:

26.5 M/M

Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:

K. Nagai : Team Leader

Approximate Total Value of the Project:

-

Narrative Description of Project:

Dong Lam Cement Joint Stock Company plans to construct Dong Lam Cement Plant with clinker production capacity of 4,000 tons/day, at Phong Xuan and Phong An Communes, Phong Dien District, Thua Thien Hue Province, based on the Investment License granted by the Prime Minister under its letter No. 404/TTg-CN dated March 13, 2006.  In order to meet the demands for materials transportation of the plant, the project owner intends to construct a general cargo seaport and a dedicated road route connecting from the plant to the seaport. Phase 1 Project (2008-2013) will cover 1) construction of clinker loading berth for the vessels of 7,000 DWT (total handling capacity of cargo throughput would be about 15 million tons/year.), 2) construction of breakwaters, dredging of access channel dredging and turning area in front of the berth, and 3) construction of storage facilities and unloading/loading equipment.

Description of Actual Services Provided by Your Staff:

The consulting services provided by our staff cover the following :

1)      Preparation of requirements for additional natural conditions surveys and data collection to be done by the Employer;

2)   Data collection, site visit and evaluation of the adequacy and reliability of the collected data and surveyed results report;

3)   Feasibility study including layout planning, basic design, investment planning and total cost estimate for investment; and

4)   Legal procedures related to application of Procedure for Port Location and Procedure for Berth Alignment Plan.