1983

The Tokyo Electric Power Company, Incorporated.

M Area Coal Port Development Project

Port Planning and Basic Design for facilities receiving 100,000D/W Coal Carrier Ships

M Area

398,000

Electric Power Development Co., Ltd.

Ishikawa Thermal Power Plant Construction Project

Basic Design of Jetty for Alteration of Okinawa Ishikawa Thermal Power Plant from Oil to Coal Fuel

Kanatake Port, Japan

81,000

1985

The Hokuriku Electric Power Company, Incorporated.

Port Facility Design Study for Suruga Thermal Power Plant

Basic Design of Berth and Seawall Structures in Suruga Thermal Power Plant

Suruga New Port, Japan

32,000

The Chub Electric Power Company, Incorporated.

Port Facility Design Study for Hainan Thermal Power Plant

Basic Design of Reclamation Revetment in Hainan Thermal Power Plant2.1Mil.kW

Kinuura Port, Japan

335,000

1986

The Chub Electric Power Company, Incorporated.

S Area Coal Port Development Project

Suitability Study of Port Location and Layout Planning of related Facilities

S Area

86,000

1989

The Okinawa Electric Power Company, Incorporated.

Thermal Power Plant Port Planning Study

Layout Planning and Basic Design of Coal Loading Jetty

Kanatake Port, Japan

215,000

1990

Chubu port service Ltd

Study on Coal Berth in Shimizu Port

Conceptual Design Study on Coal Berth for Carrier Ships (150,000DWT)

Shimizu Port, Japan

90,000

The Okinawa Electric Power Company, Incorporated.

Detailed Design Study on Coal Jetty in Gushikawa Thermal Power Plant

Detailed Design Study on Coal loading Jetty (-14m depth, 800m offshore, 285 length, 20m width) for 60,000DWT Carrier Ships

Gushikawa Port, Japan

252,000

1991

Soma Kyodo Power Company,Ltd.

Port Facility Design for No. 1 Plant in Shinch Thermal Power Plant

Layout Planning and Detailed Design Study on Coal and Oil Loading Jetty and Dolphin

Souma Port, Japan

637,000

The Hokuriku Electric Power Company, Incorporated.

Basic Design Study on Coal Jetty in Nanao Ohta Thermal Power Plant

Basic Design Study on Coal Loading Jetty and Transfer Bridge for 5,000DWT Carrier Ships

Nanao Port, Japan

250,000

1993

The Okinawa Electric Power Company, Incorporated.

Basic Study on New Thermal Power Plant

Basic Design Study on Port related Facilities

Southern Okinawa

38,000

1994

The Okinawa Electric Power Company, Incorporated.

Engineering Study on New Thermal Power Plant

Planning and Detailed Design Study on Coal Loading Berth and Ash Dumping Area

Kanatake Port, Japan

495,000