Year
|
Name of Client
|
Name of Service
|
Scope of Service
|
Location of Service
|
Service Price ($)
|
1983
|
The Tokyo Electric Power Company, Incorporated.
|
M Area Coal Port Development Project
|
Port Planning and Basic Design for facilities receiving 100,000D/W Coal Carrier Ships
|
M Area
|
398,000
|
Electric Power Development Co., Ltd.
|
Ishikawa Thermal Power Plant Construction Project
|
Basic Design of Jetty for Alteration of Okinawa Ishikawa Thermal Power Plant from Oil to Coal Fuel
|
Kanatake Port, Japan
|
81,000
|
1985
|
The Hokuriku Electric Power Company, Incorporated.
|
Port Facility Design Study for Suruga Thermal Power Plant
|
Basic Design of Berth and Seawall Structures in Suruga Thermal Power Plant
|
Suruga New Port, Japan
|
32,000
|
The Chub Electric Power Company, Incorporated.
|
Port Facility Design Study for Hainan Thermal Power Plant
|
Basic Design of Reclamation Revetment in Hainan Thermal Power Plant(2.1Mil.kW)
|
Kinuura Port, Japan
|
335,000
|
1986
|
The Chub Electric Power Company, Incorporated.
|
S Area Coal Port Development Project
|
Suitability Study of Port Location and Layout Planning of related Facilities
|
S Area
|
86,000
|
1989
|
The Okinawa Electric Power Company, Incorporated.
|
Thermal Power Plant Port Planning Study
|
Layout Planning and Basic Design of Coal Loading Jetty
|
Kanatake Port, Japan
|
215,000
|
1990
|
Chubu port service Ltd
|
Study on Coal Berth in Shimizu Port
|
Conceptual Design Study on Coal Berth for Carrier Ships (150,000DWT)
|
Shimizu Port, Japan
|
90,000
|
The Okinawa Electric Power Company, Incorporated.
|
Detailed Design Study on Coal Jetty in Gushikawa Thermal Power Plant
|
Detailed Design Study on Coal loading Jetty (-14m depth, 800m offshore, 285 length, 20m width) for 60,000DWT Carrier Ships
|
Gushikawa Port, Japan
|
252,000
|
1991
|
Soma Kyodo Power Company,Ltd.
|
Port Facility Design for No. 1 Plant in Shinch Thermal Power Plant
|
Layout Planning and Detailed Design Study on Coal and Oil Loading Jetty and Dolphin
|
Souma Port, Japan
|
637,000
|
The Hokuriku Electric Power Company, Incorporated.
|
Basic Design Study on Coal Jetty in Nanao Ohta Thermal Power Plant
|
Basic Design Study on Coal Loading Jetty and Transfer Bridge for 5,000DWT Carrier Ships
|
Nanao Port, Japan
|
250,000
|
1993
|
The Okinawa Electric Power Company, Incorporated.
|
Basic Study on New Thermal Power Plant
|
Basic Design Study on Port related Facilities
|
Southern Okinawa
|
38,000
|
1994
|
The Okinawa Electric Power Company, Incorporated.
|
Engineering Study on New Thermal Power Plant
|
Planning and Detailed Design Study on Coal Loading Berth and Ash Dumping Area
|
Kanatake Port, Japan
|
495,000
|